theraineysisters knitting and so much more

July 15, 2006

From Susan — Ponchette est finis

Filed under: Current Projects,Updates — lv2knit @ 1:03 pm

The Ponchette is history.  I actually finished it and had to rip out two repeats, so it is finished and then some.  I like wearing it as pictured below: more poncho style.  It hangs long in front (covering my waist) and hugs the shoulders nicely.  The thing I did differently here was to work an i-cord edge along the top so it would not be a raw garter at selvedge AND to give it a firmness so it would be less likely to stretch.  I did not block it at all.  The only blocking I might do is to pin out the points to make them pointier.

PochetteFinished002.jpg

Here is the back:

PochetteFinished004.jpg

And a seam detail:

PochetteFinished003.jpg

So you won’t think I have something against handpainted variegated yarns, here are some pictures of a past sweater made using Cherry Tree Hill Merino and Silk DK in Gypsy Rose.   The pattern was in a summer issue of Vogue (2003 or 2004?).  The one pictured in the magazine was quite short (view-of-bellybutton short) and had 3/4 length sleeves — I think to conserve yarn.  At $35-40 per skein, I can see why!  I added length and width, and made long sleeves, so I used 6 rather than 4 skeins.  The way the colors are created in the yarn, each small diamond contains all the colors.  I don’t think most other yarns would do that.

DiamondPullover003.jpg

I love the way the neckline does a little zigzag.  You do a crocheted edging to finish it off.  The other change I made was to have the front and back necklines the same.  They added a straight insert across the back which I found unnecessary.

DiamondPullover001.jpg

Another past favorite in handpainted variegated is another Vogue design — from the 2003 Winter Special Occasions issue.  I knitted it in Mountain Colors’ Mountain Goat, a mohair blend in color Yellowstone.  It is fabulous yarn to work with! 

MiteredCardigan016.jpg

The Norah Gaughan design is fantastic for garter stitch because the structure of the jacket provides support and therefore reduces stretching.  Look closely at the back:

Mitered Back View

The diamonds are actually formed by two different pieces and joined through the center by picking up sts through the cast on edge.  It is ingenious and extremely fun to knit.  You start with one square at a time and keep adding on until the back or fronts are done.  I wear this one all through the fall as a coat.

July 11, 2006

From Susan — Ponchette Update

Filed under: Current Projects,Updates — lv2knit @ 7:37 am

The Ponchette is at the 32″ mark.  The finished length for the largest size is 53″ so I’m  getting there.  It is a lot of knitting!  I would post a pic but it looks the same except wider.  When you’re knitting along, you see all the gorgeous colors — seagreen, rose, gold, purple – but when you look at it overall, it looks kind of muddy green and reddish pink.  Hmmmmm.  Oh well, on I go.  I am enjoying the knitting, and I’m sure when it’s done it will go with something! 

July 4, 2006

From Susan — Internet: the new Heroin

Filed under: Current Projects,Updates — surly @ 6:17 pm

Our internet service was out from the day I got back to today.  We were all in withdrawal.  Everything we did, we thought, “I’ll go check it out on the internet….no, wait, I can’t.”  It was horrible!  I had no idea I was so hooked.

I went to my friend’s daughter’s wedding on Saturday evening, which was the reason Sally and I had to hotfoot it back from Omaha.  The wedding was beautiful.  The following people were wearing my daughter’s jewelry creations:

Bride, three bridesmaids, two junior bridesmaids, two grandmas, one mother of the bride, two of my daughters, one guest, and me.  I was bursting with pride!  The junior bridesmaids each wore one of the small wedding ring purses on their wrists and then gave them to the bride and groom to open at ring time.  It was quite cute.  The bride wore the wedding purse throughout the reception.

I am 99% done with Ballerina — it is blocking at this very moment.  I wanted to block it before knitting the cuffs so I would know how long the sleeves would end up.  Good plan because the sleeves gained at least 3”!!  Thank goodness because they were SOOOOO skimpy.

I’ll post more later with some pictures and the update on my next major project — it is something that has been aging gracefully for at least 2-3 years (maybe more).   Sally and I will also share our impressions of the knitting shops we visited along the way. 

It is good to be home.

PS — Ballerina was dry this morning so I tried it on.  The sleeves are the perfect length without adding cuffs at all (!?!).  That was surprising!  I’ll i-cord edge the sleeves tonight and it will be D-O-N-E.

June 22, 2006

From Susan — Mini Update

Filed under: Updates — surly @ 7:49 am

The Wedding Ring Purses are complete.  Ballerina is nearing the finish line.  And all I can say about Sally’s Icarus Shawl is WOW!!

Wedding Ring Purses

June 20, 2006

From Susan — Sunrise Oval Jacket

Filed under: Sunrise Circle Jacket,Updates — lv2knit @ 6:32 am

I have been too busy to get my Sunrise blocked, but I thought I would share some pictures of it anyway.  It is such a cool pattern, and I enjoyed making it very much.  I love things that are a little different — classic yet unique — and this certainly qualifies. 

MultiPics001.jpg

Here is the “oval”:

MultiPics003.jpg

Here are some detail pictures:

Hem

MultiPics004.jpg

Left front

MultiPics005.jpg

I also spent some time on Ballerina.  I recommend that if you make this jacket, you keep some notes or something.  My two sides are not what I would call perfectly symmetrical.  It’s not something you can see really, but I did need to fudge to get the numbers to work out, and I have no idea why.  The stitch count is the same, so either Hanne designed it with the sides a bit off, or I am a bit off.  Don’t answer that!

MultiPics006.jpg

I am still toiling on my scarf and the wedding ring purses will be done this evening — pictures of them tomorrow…

June 17, 2006

From Susan — A Multi-Tasking Update

Filed under: Sunrise Circle Jacket,Updates — lv2knit @ 9:41 am

As Sally was quick to point out, I had a birthday.  I left work early and spent my afternoon lurking in yarn stores.  I stopped by Borealis – in St. Paul – and asked them if I could hang around and knit.  They were very pleasant about it.  There is a scarf in the shop that I have loved since I first saw it.  It is a simple feather and fan pattern made with Cherry Tree Hill sock-weight merino in the color African Gray.  It has every color in the rainbow, predominantly purple and orange (!).  What on earth will THAT go with?  I bought the $22 skein, which actually makes TWO scarves (one for me, and yarn for Sally) and threw it in with my Sunrise Circle Jacket – it is perfect with it!  I think it will actually go with a lot of stuff because it has so many colors in it.  Here is the start of the scarf:

featherandFanScarf.jpg 

I also did finish the Sunrise Jacket.  I think it turned out.  I will need to get the buttons (there’s no rush, so I’m going to be picky), but I think it fits and looks good.  I am going to block it one more time for good luck.

Laura wants me to line her felted purse and include a zippered pocket.  Here is the lining she chose:

Purse Lining

For my birthday, my two girls got me some very nice gifts.  The toiletries came in the cutest knitting bag!  I was more excited about the bag than the lovely lotions etc.  It is absolutely perfect for small projects and right now I have 3 going; beaded purse, wedding ring bag, and scarf.  All three will travel in the new bag for

varietal knitting!

IMG_3862.jpg

June 14, 2006

From Susan — Ballerina

Filed under: Updates — lv2knit @ 7:02 am

Last evening I taught a knitting class at Amazing Threads in Maple Grove — beginning lace.  It was fun.  It was the first of my classes to “go” since January (other than the all-day Yarnover event in April).  I’ve heard that from other shops and teachers — that classes are not filling like they used to.  Any thoughts out there as to why??  I know there are knitters out there — where are they?

I stayed at Amazing Threads for a little while to finish knitting the right sleeve of Ballerina.  When I got home I did a 3-needle bind off to join the sleeve seam.  I tried it on and the sleeves are about 5 inches too short, and I already lengthened them 2″.  You’re supposed to pick up along the bottom edge of the sleeve and knit a garter stitch band, which is meant to add a couple of inches, but mine is going to have to be a lot wider than the design shows.  After putzing with Ballerina, it was too late to bind off the mega sts on Sunrise — I hope to get to that tonight.

June 11, 2006

From Susan — WWKIP Update (and Sunrise Update)

Filed under: Back Story,Current Projects,Sunrise Circle Jacket,Updates — lv2knit @ 9:49 am

Yesterday was World Wide Knit in Public Day, as I mentioned a couple of days ago.  I did make it to Barnes & Noble in Blaine to meet up with Mary and her knitting pals, Tessa, Becky, and Emily — very nice young women.  A few of MY knitting pals also showed up: Marilyn, her daughter, Nicole, Julie, and Emily.  My oldest daughter, Laura, came with me with her current knitting project.  It was a lot of fun.  Mary et al are just starting out on their knitting journey.   Some of the rest of us have “been on the road” awhile!  It was fun to share our love of knitting and help out some of the newbies as they interpreted the sometimes confusing world of knitting patterns.  I’ll be there next year, Mary!

I bought this magazine at B&N because of the pattern for the sheep puppets — I do not spin and do not plan on ever learning.  I only have time for knitting.

Sheep Puppets

Are these the cutest things you’ve ever seen?  I think you could substitute fair isle weight shetland.

Sunrise is setting:  I am finishing Sunrise.  What intrigued me about this pattern was the possibility that the entire outer perimeter could be handled as one big circle, instead of working it in pieces — neck, lower back edge, front half circles.  So, I decided to do an I-cord bind off around the entire perimeter (instead of a purl turning row as shown) and then I will pick up the facing and knit it in one piece in the round.  To do this, I’ll either need several sets of circular needles, which I own but probably can’t find, or buy one really long needle.  I had been thinking that the bottom back hem did not need a facing, but I think I’ll go ahead and do it to prevent curling.  The sleeves will not get a facing. 

Sunrise Front I-Cord

This in-progess view shows the right front I-cord bind off completed.  The bottom back edge is also finished.  There is a way to do an i-cord bind off and keep live sts so you can keep knitting.  It was not worth the trouble here and does not turn out as well anyway.  As you can see, this is a fairly slow process, so I doubt I’ll get it done today.  Button shopping is next 🙁

June 7, 2006

From Susan — A Blast from the Past

Filed under: Updates — lv2knit @ 12:11 am

I decided to pull this project out of mothballs because it is very portable and mindless.  I have made several of these purses (this is my design), but have given them all away.  This one is for me.  The beads are much prettier in person.  They have a copper sheen and touches of aqua that can’t be seen here.  I hope to get a better picture at some point, but the design can be seen in Susan’s Gallery (see ‘black beaded purse’).  The embellishments will be a bit different but the style is the same.  I am using sz 000 needles (24″ circular Addis) and size 11 seed beads — approximately 8,000.  It goes faster than you would expect if you just keep plugging away.  When you are done with the knitting, you sew the bag onto the purse frame.

Beaded Purse on Cream

I am also still working on Sunrise and Ballerina: Sunrise is blocking and drying at this moment, and I will work on Ballerina in between.  I hope to finish Sunrise this weekend — woo hoo. 

June 5, 2006

From Susan — 80 Down, 20 to Go

Filed under: Sunrise Circle Jacket,Updates — lv2knit @ 11:37 pm

Quick update: I finished the knitting of the Sunrise Circle Jacket tonight, though I did not block it — too late.  I’ll do it when I get home tomorrow.  It should dry overnight.  I’ll drag out Ballerina to haul around for a while.  I have to have something with me to knit!!  Not real portable, but mindless.

« Newer PostsOlder Posts »

Powered by WordPress