theraineysisters knitting and so much more

May 4, 2006

From Susan — Ballerina Update

Filed under: Current Projects — lv2knit @ 11:25 pm

It feels like I haven’t done much on my Hanne Falkenberg Ballerina (color #13) — I’ve just been kind of chipping away at it slowly but surely.  Here is the updated progress report.  I’m almost to the side “seam.”  I have probably 10 ridges and then I’ll start the right sleeve.  It is such slow knitting.  You’re on very small needles and doing nothing but garter.  I did haul it with me to work today and actually got to knit on my lunch break.  I have not been able to knit at work for awhile — and I need that down time to regroup! 

Ballerina

Here is a detail shot of the back right shoulder shaping:

Right Back Armhole

It is all short rows all of the time.  The technique is the yarnover short row — a Hanne trademark.  They work pretty well for the way it is designed, though not as well when working the short rows from the top down, as I do with my sleeve variation and for the center back gusset of the Mermaid Jacket.  I’ll show pictures of my sleeve detail when I get to that point.

Thursday Knitting Group was quite fun tonight.  I did not get home until 9pm.  Woo hoo — wild social life!

 

1 Comment »

  1. Hmmmm . . . my Ballerina kit is sitting behind the sofa, waiting patiently for me. Tempting!

    Comment by Wendy — May 5, 2006 @ 5:50 am

RSS feed for comments on this post. TrackBack URL

Leave a comment

Powered by WordPress